Place of Origin: | Shandong, China |
---|---|
Brand Name: | Feiteng |
Certification: | EAC, ISO9001, ISO14001, OHSAS18001 |
Model Number: | YZSL-20 |
Minimum Order Quantity: | One set |
Price: | Negotiation |
Packaging Details: | whole set put into container |
Delivery Time: | 10-15 days per set |
Payment Terms: | L/C, T/T |
Supply Ability: | 15 sets per month |
Product Name: | Self Heating Asphalt Tank | Application: | Asphalt Tank For Road Construction |
---|---|---|---|
Type: | Diesel Oil Burner Heating | Usage: | Supporting Equipment For Asphalt Plant |
Model: | YZSL-20 | Color: | White Or Customized |
Total Capacity: | 20 M3 | Dimension: | Diameter 2.25 M × Length 7.4 M |
Function: | Bitumen Heating And Storage | Material: | Carbon Steel |
Warranty: | 1 Year After Delivery | Power: | 8 Kw |
High Light: | asphalt container,oil heating tank |
Diesel oil burner self heating asphalt tank for road construction
YZSL series fuel automatic double heating bitumen storage tank is an energy saving, environmental protection and high automatic performance product carefully designed by our company in order to meet the increasing requirements of energy saving and environmental protection in our country, and to improve the civilized production level of bitumen storage and heating process, combined with the rich experience accumulated in the field of asphalt heating over the years. This equipment is combined the bitumen tank and heat thermal oil boiler as a complete unit. It can heat bitumen and also can provide high temperature heat thermal oil.
Cylinder shape asphalt heating tank main components
Mainly include tank body(including insulation layer), diesel burner, built-in combustion chamber (including thermal oil jacket layer), multirow flue and thermal oil coils, asphalt pump, thermal oil circulation pump, thermal oil expansion tank, asphalt temperature control system, thermal oil temperature control system, liquid level meter, pipeline and asphalt pump heat tracing system, asphalt entrance and exit, climbing ladder, switch box and discharge manger.
Working principle
The device has a built-in combustion chamber with a thermal oil jacket layer, and the multirow of flue and the thermal oil coil. The thermal oil is heated by the flame in the jacket layer, then the hot thermal oil is pumped and passed through the coil to heat the asphalt, meanwhile, the hot exhaust also heat the asphalt through the multirow flue, so the two methods including the high temperature flue and the hot thermal oil coil heat the asphalt at the same time.
Features
1, Low equipment investment, low transportation costs, less space occupation, easy installation:
The integral design perfectly combines the thermal oil boiler with the asphalt tank. Compared with the traditional split equipment, say boiler and tank separately, this design not only saves the transportation cost of the thermal oil boiler, saves the space occupied by the thermal oil boiler, reduces the equipment investment, and reduces the trouble of installing the thermal oil boiler.
2, High heat utilization rate, effective utilization of waste heat and energy saving:
The built-in heating chamber makes the heat transfer more direct and less heat loss; the heat transfer area of thermal oil coil and high temperature flue in the tank is large, the heating speed is fast, the production efficiency is high, the high temperature flue gas waste is effectively used to heat up, and the energy is saved to the maximum extent; the whole body of the tank is insulated and protected by the thick high quality rock wool material. It has excellent temperature performance and low heat loss.
3, Heating uniformity, avoiding asphalt aging:
Thermal oil indirect heating avoids asphalt aging caused by direct contact with asphalt in high temperature furnace.
4, Highly automated:
There is an automatic temperature control system. The burner can start and stop automatically according to the set temperature of asphalt and thermal oil without manual supervision.
5, High safety performance:
The temperature automatic control system avoids the danger caused by over temperature heating of asphalt and thermal oil, and the interlock between burner and thermal oil circulating pump avoids the danger caused by non-circulating of thermal oil.
6, Stable performance:
Mature design, high-quality accessories, sophisticated production and strict inspection ensure the stability of the equipment.
Item | Unit | Parameter | Remark |
Heating way | Double heating including burning flue and thermal oil coils | ||
Heating speed | degree per hour | 10-15 | air over 25 degree |
Diesel consumption | kg/ asphalt per ton | 3-5 | continuous production |
Bitumen highest temperature | degree | 180 | |
Total capacity | m3 | 20 | |
Outer size | m | diameter 2.25 × length 7.4 | total length |
Support | unit | complete base | |
Bitumen pump flow | m3 per hour | 16.8 | |
Total power | kw | 8 | |
Power supply | 380v 50Hz stable AC power | ||
Thermal oil work temperature | degree | 200-250 | |
Bitumen temperature control | auto control | ||
Thermal oil temperature control | auto control | ||
Environmental protection | Complying with (better than) environmental protection requirements |
Our advantages
Our factory, DEZHOU FEITENG ROAD CONSTRUCTION EQUIPMENT CO., LTD., specializes in designing and manufacturing asphalt equipment, mainly including asphalt melting equipment for drum/box/bag packing, asphalt tank, asphalt emulsion equipment and asphalt sprayer, also we have the big advantages as below,
1. Independent design and professional manufacturer.
2. Production capacity over 200 sets per year.
3. All equipments with compact structure, suitable for container load.
4. Select premium steel with high quality.
5. Complete production control with detailed record and video.
6. Our factory had passed ISO system authentication, including ISO9001, ISO 14001, OHSAS18001.
7. We manufacture our standard equipment, also welcome OEM and ODM.
Our service
Our factory, DEZHOU FEITENG ROAD CONSTRUCTION EQUIPMENT CO., LTD., specializes in designing and manufacturing asphalt equipment, you may get as below,
1. Design drawing as your requirement
2. Equipment solution as your real condition
3. Quality equipment as your order
4. Quick response as your time
5. Fast delivery as your demand
6. Complete warranty as your expect
Quality product, quick response and cost saving.
Delivery and shipping
1. Production time around 5-15 days per set
2. Suitable for 40 HQ container loading
3. Trade terms EXW, FOB, CFR, CIF
After sale service
1. Warranty one year
2. Online support service and video technical support
3. Free spare parts
4. Field installation, commissioning and training, field maintenance