کیس اسٹڈی: اعلیٰ صلاحیت والے PMB پلانٹس کے ساتھ ویتنام میں نارتھ-ساؤتھ ایکسپریس وے کو تیز کرنا

2026-04-23

مندرجات کا جدول

    Project Overview

    Vietnam’s North-South Expressway is a monumental infrastructure project aimed at connecting the northern and southern regions of the country. Given the high traffic volume and tropical climate, the asphalt requirements are exceptionally demanding. Feiteng was selected to provide high-capacity Polymer Modified Bitumen (PMB) plants to ensure the durability and quality of the road surface.

    Technical Solution: High-Capacity PMB Plants

    Feiteng delivered two sets of DXL series bitumen plant specifically configured for the project. These plants feature:

    • Precision Modification: Advanced shearing technology for uniform polymer distribution.
    • High Stability: Integrated control systems to maintain consistent bitumen quality.
    • Efficiency: Optimized heating systems to reduce energy consumption during the modification process.

    dxl-ربڑ-بیٹومین-پلانٹ-انسٹالڈ-سائٹ

    Impact on Vietnam’s Infrastructure

    The deployment of these PMB plants significantly accelerated the construction timeline. By producing high-quality modified bitumen on-site, the contractor was able to meet the stringent specifications set by the Vietnamese Ministry of Transport. This project serves as a benchmark for future highway expansions in Southeast Asia.

    Related Equipment

    For projects requiring different asphalt solutions, Feiteng also offers:

    نتیجہ

    Feiteng continues to be a trusted partner in global infrastructure development. Our commitment to innovation and quality ensures that every project, like the North-South Expressway in Vietnam, receives the best bitumen equipment available.

    ہم سے رابطہ کریں۔ today to learn more about our solutions.

    سفارش

    ہم سے رابطہ کریں۔