-
Mobile Bitumen Storage: Site Setup and Relocation Checklist
Mobile bitumen storage can mean a tank that is relocated between project sites, a trailer-mounted storage arrangement or a transport unit. Before comparing quotations, ask the supplier to define exactly how the proposed tank will be supported, operated and moved. A tank that can be delivered on a truck is not automatically suitable for transport while filled with hot bitumen.…
2026-11-12 -

How to Choose an Asphalt Distributor: Tank Capacity, Spray Control and Buyer Checklist
Choosing an asphalt distributor starts with four questions: what binder will you spray, what application rate does the project require, how much road must you cover between refills, and what loaded weight can the chassis legally carry? An 8m³ asphalt distributor can reduce refill stops compared with a smaller tank under the same operating conditions. A compact bitumen sprayer may…
2026-11-12 -
Bitumen Storage Tank Heat Loss Calculation: Insulation Thickness & Energy Cost Guide
Bitumen storage tank insulation is not simply a matter of selecting 50 mm or 100 mm mineral wool. The appropriate thickness depends on tank geometry, storage temperature, climate, insulation conductivity, wind exposure, roof details and operating schedule. This guide shows how to estimate heat loss for a bitumen tank, compare insulation thicknesses and convert the result into a preliminary heating-energy…
2026-10-29 -
Bitumen 60/70 vs 80/100: Key Differences, Uses & Which Grade to Choose
Bitumen 60/70 and 80/100 are two commonly discussed penetration grades used in road construction. Both can be used as paving binders, but they are not identical: 60/70 is generally harder, while 80/100 is softer. That difference influences how a binder behaves when the pavement is hot, cold, or under traffic. If you are buying bitumen for an asphalt mixing plant…
2026-10-22 -
Containerized Bitumen Equipment: Design, Installation and Transport Considerations
For international road contractors, a bitumen system must do more than meet its rated production capacity. It must reach the job site, connect to available utilities and support reliable operation throughout the project. Containerized bitumen equipment can simplify transport and reduce some site assembly work, but the benefits depend on how the equipment is designed. A machine shipped inside a…
2026-10-15 -
Bitumen Pipeline Heat Tracing Design: Thermal Oil Jacket vs Electric Heat Tracing
A correctly sized bitumen pipeline can still fail if the binder inside it becomes too cold to pump. For this reason, hot-bitumen transfer systems should be designed as both hydraulic systems and thermal systems. Pipe diameter determines flow and pressure loss, while heat tracing and insulation determine whether the binder remains within a suitable operating range. Two common approaches are…
2026-10-01 -
How to Calculate Pressure Loss in a Hot Bitumen Pipeline
Calculating bitumen pipeline diameter is only the first step in transfer-system design. The next question is whether the selected pump can actually move the required flow through that pipeline. Every metre of pipe, every elbow, valve and filter, and every metre of vertical elevation creates resistance. Because bitumen is highly temperature-sensitive and can be significantly more viscous than water or…
2026-09-17 -
How to Calculate Bitumen Pipeline Diameter for an Asphalt Mixing Plant
Selecting the correct bitumen pipeline diameter is an important part of designing a reliable asphalt mixing plant supply system. A pipeline that is too small can create excessive flow velocity, high pressure loss, increased pump load, and unstable bitumen delivery. A pipeline that is unnecessarily large increases material cost, heat-loss surface area, thermal oil demand, insulation cost, and the amount…
2026-09-04 -
How to Design a Complete Bitumen Handling System for an Asphalt Mixing Plant
An asphalt mixing plant may be rated for 80, 120, 160, or even 240 tons of asphalt per hour, but that production capacity means very little if the bitumen supply system cannot keep up. This is a problem many contractors discover only after installation. The asphalt plant itself may have sufficient production capacity, while the bitumen system suffers from slow…
2026-08-13 -
Quick Reference: Bitumen Storage Tank Price Ranges in 2026
Ask three suppliers for a quote on “a 40m³ bitumen storage tank” and you may receive three numbers that differ by 50% or more. The tank size is the same – so where does the gap come from? After 15+ years of building bitumen tanks in Dezhou and shipping them to projects across Asia, Africa, the Middle East and Europe,…
2026-07-09
